Tuesday 4 November 2014

1st Site Survey

The block has been surveyed indicating where the building pad will sit on the land. It shows where the drott will cut into the block and and bring the soil to the fill area, hence the term cut and fill for a slab foundation. Orange marks are survey points at the front of the land. Pink ribbon is in the back yard.
 
 

No comments:

Post a Comment